
Pre-formatted captions, a short link, and a QR code — ready to paste.
Willco Industrial Center – 1,008 acre Industrial Land Tract <p> • 1,008± contiguous acres - (click here to view recent boundary survey). </p><p> • Dual 345kV / 138kV (Ameren) transmission line across site </p><p> • 6” main (Spire Energy) near site </p><p> • 12” main (Missouri American Water) in adjacent Hazelwood Tradeport with easement in-place </p><p> • Metropolitan St. Louis Sewer District (“MSD”) manhole in adjacent Hazelwood Tradeport with easements in-place; lift station anticipated Currently zoned “NU” Non-Urban District in City of Hazelwood
Run the numbers on this deal. All calculations are estimates — verify with your lender and accountant.