
Pre-formatted captions, a short link, and a QR code — ready to paste.
7.64% Projected CAP <ul><li>Architectural Foundation & Engineering Flexibility: A near-complete architectural permit set by Kennedy Mann Architecture is in hand, and MEP/structural drawings were intentionally paused to preserve flexibility, allowing a buyer to either pick up where the team left off or transition the plans to their own design consultants.</li><li>Shovel-Ready Demo Execution: The interior demolition permit has already been secured and executed. A buyer can mobilize and begin work under this active
Run the numbers on this deal. All calculations are estimates — verify with your lender and accountant.