
Pre-formatted captions, a short link, and a QR code — ready to paste.
Prime Redevelopment Opportunity at Signalized Intersection <ul><li><strong style="color: rgba(0, 0, 0, 1)">Prime Corner Location</strong><span style="color: rgba(0, 0, 0, 1)"> – Freestanding building positioned at a signalized intersection with a dedicated turn lane and curb cut on the primary corridor</span></li><li><strong style="color: rgba(0, 0, 0, 1)">High Traffic Exposure</strong><span style="color: rgba(0, 0, 0, 1)"> – 49,000± vehicles per day along W. Pike Street (GA HWY 120)</span></li><li><strong style="color: rgba(0, 0, 0, 1)">Strong Dayti
Run the numbers on this deal. All calculations are estimates — verify with your lender and accountant.