
Pre-formatted captions, a short link, and a QR code — ready to paste.
Fully Permitted and Shovel-Ready Project Anticipated by July 31st, 2026 <ul><li>11-acre B-2 Zoned Development Site Allowing Self-Storage, RV Storage, and Boat Storage by Right</li><li>Fully Permitted and Shovel-ready Project Anticipated by July 31, 2026</li><li>Planned For 96,760 NRSF - including 54,800 NRSF (540 units) Climate Controlled, 41,960 NRSF (163 Units) Drive-Up Non-Climate, and 97 Covered RV & Boat Parking Spaces</li><li>No Planned or Under-Construction Self-storage Facilities Within a Five-mile Radius</li><li>Strategic Highway Location with Signaliz
Run the numbers on this deal. All calculations are estimates — verify with your lender and accountant.